The Sardar Sarovar Dam on Narmada River (Also called Gujarat's Lifeline ) |
- The Sardar Sarovar Dam is really a gravity dam on the Narmada river near Navagam, Gujarat in India.Four Indian states, Gujarat, Madhya Pradesh, Maharastra and Rajasthan, receive water and electricity supplied from the dam.The building blocks stone of the project was presented by Prime Minister Jawaharlal Nehru on April 5, 1961. The project took form in 1979 included in a development scheme to improve irrigation and produce hydroelectricity. The dam was inaugurated by Prime Minister Narendra Modi on September 17, 2017
- One of many 30 dams in the offing on stream Narmada, Sardar Sarovar Dam (SSD) is the greatest design to be built. It's one of many biggest dams on the planet It is really a area of the Narmada Pit Challenge, a sizable hydraulic executive task relating to the structure of some big irrigation and hydroelectric multi-purpose dams on the Narmada river. Subsequent numerous controversial instances ahead of the Great Judge of India (1999, 2000, 2003), by 2014 the Narmada Get a grip on Power had accepted some improvements in the last height – and the related displacement brought on by the improved tank, from the first 80 michael (260 ft) to one last 163 michael (535 ft) from foundation.The task may irrigate a lot more than 18,000 km2 (6,900 sq mi), nearly all of it in famine vulnerable aspects of Kutch and Saurashtra.
- The dam's major energy seed properties six 200 MW Francis pump-turbines to produce energy and add a pumped-storage capability. Moreover, an electrical seed on the consumption for the key canal includes five 50 MW Kaplan generator-generators. The sum total fitted volume of the energy services is 1,450 MW.
Place India Area Navagam, Gujarat, India Coordinates 21°49′49″Deborah 73°44′50″Elizabeth Position Detailed Construction started May, 1987 Opening day 17 September, 2017 Owner(s) Narmada Get a handle on Power Dam and spillways Type of dam seriousness dam, cement Impounds Narmada Lake Level 138.68 yards Height (foundation) 163 michael (535 ft) Period 1,210 michael (3,970 ft) Spillway volume 84,949 michael3/s (2,999,900 cu ft/s) Tank Total volume 9.5 km3 (7,700,000 acre⋅foot) Active volume 5.8 km3 (4,700,000 acre⋅foot) Catchment place 88,000 km2 (34,000 sq mi) Surface place 375.33 km2 (144.92 sq mi) Maximum period 214 km (133 mi) Maximum thickness 1.77 km (1.10 mi) Maximum water degree 140m Normal elevation 138 michael (453 ft) Energy Section Operator(s) Sardar Sarovar Narmada Nigam Restricted Commission day July 2006 Generators Dam: 6 x 200 MW Francis pump-turbine
Canal: 5 x 50 MW Kaplan-type[2]Installed volume 1,450 MW [1 Thousand kWh every year]
No comments:
Post a Comment